What are the operating steps of the cast film machine?

Only trained and qualified personnel should operate the cast film machine. During the test, two operators are required to cooperate to complete all the test work. (1) Preparations (1) Check whether all fasteners or connectors in the cast film machine are connected reliably; (2) Check the connections of all power cords and air pipes again; (3) Before starting the cast film machine, heat the instrument to a suitable temperature (depending on the material); Before heating, double check that the thermocouple is installed correctly to avoid abnormal heating or even damage to the heating ring. (4) Start the cast film machine (for specific operations, please refer to the software operation instructions).



Related News


Message

Welcome to leave us a message and we will reply to you as soon as possible.

Copyright: ZL-Machinery Co., Ltd. Business License